This past weekend I purchased some more tools and supplies (plastic sheeting for walls & panels for walls) for the job. I managed to do a few things including rehanging the main door so that it swings into the rec room instead of the train room. I also corrected a small copper pipe that goes to the fridge (that was hung with nails and not brackets) that was bent and hanging. I also installed a couple more electrical outlets and switches and cleaned up the room a bit. Next up I still need to isolate and repair that water leak, put up the plastic sheeting and panel the walls. Then comes the drop ceiling. No pics, sorry.