Archive for September, 2003

More electrical work

Monday, September 15th, 2003

Completed all the wiring for the room and installed about 70% of the outlets. I am holding off on some of the outlets b/c they are to be installed after the paneling on the walls. It’s great to make this progress. I think I will paint the walls next and measure for paneling and drop ceiling.

I also added a couple more links to the Links page. Check it out!

Electrical work begins

Monday, September 8th, 2003

I finally got around to starting roughing in the electrical system. It’s great work, and nice to finally have it going. Spent a lot of time on Sat-Sun sketching and scheming and consulting with Dad about it, and finally got underway. I made good progress. Read about it in the Gallery.On another note, my layout planning is going well. I have decided (at this time) to go back to a 2-level layout. I have room for a helix and I really can’t seem to fit all that I want to fit in only 1 level. So, I’m going for it. Layout plans should be posted soon.