Layout Construction update

Upper helix lead
The upper deck helix lead.

It has been a very, very long time since I posted an update here on the blog about my model RR progress. Let me get things up to speed. The benchwork for the layout is about 95% complete. I have a few odds and ends to do but that hurdle has been crossed. Now I am working on adding the subroadbed, roadbed and connecting bridges and track. I completed construction on the helix and recently constructed the upper bracket and transition to allow the track to transition off the helix and enter the layout room. Remember, my helix is mobile and must be able to detach and roll away from the wall whenever the HVAC is serviced (like today!)

The staging yard was completed and track laid. I also built and installed a hinged swing-up bridge (with neodymium magnets to hold it in the up position) that connects the staging yard and the staging lead going into the layout room.  With some assistance from my train club several areas were completed, including the base for Rock Creek, and the lower helix lead entry point through the wall. One member, Tom, came over and helped me figure out how to do the entire Georgetown Jct. area, including the subroadbed and track arrangement. I realized I needed to put in the upper helix lead first, so that is what I am working on currently.

All in all, I have not been terribly busy with the layout. There are many distractions and I have many hobbies so I come back to it when I can. Also, I have spent a good bit of time researching the GB and have many, many materials to go through and add to the catalogs and notes and that takes time, too. I’m having a heck of a lot of fun with it.

As always, I try to keep my Gallery up-to-date where you can see snapshots of my progress. Enjoy! http://gallery.sluggyjunx.com/railroad_and_industrial/georgetownbranch/modelrailroad/2010-11_model_rr

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.