1941 Bethesda Freight House Construction Photos

In the prototype modeling world, I have heard many folks tell me that if I can’t find source data and photos of something, then I should go ahead and build a model of it, because you KNOW once I finish some brilliant photos and blueprints will surface. Anyone who chases ghosts of bygone eras in their research and modeling knows what I’m talking about. Thankfully, there are some wonderful folks out there like Brian R. who regularly volunteers at the B&ORRHS Archives and is also a friend who knows what my model RR project entails. He reached out to me last week with three absolutely incredible photos. (Apparently there are more! I really need to get myself back to the Archives for more digging.)

A bit of back story – Bethesda was really not much of anything when the RR came through town in 1910. Most folks in the rustic community saw it as a nuisance and impeding on their bucolic suburban hamlet. However, growth was inevitable and in the late 1930s with DC suburbs seeing lots of expansion, the B&O obviously realized that the crossroads in Bethesda were a great spot for a hub of fuel dealers, concrete plants and lumber yards and freight facilities to be located. A depot was needed. In the Spring of 1941 the railroad began construction on the depot, completing it a few months later in July. Oddly enough, they chose to build a freight house adjacent to the tracks with no provision for a connection to the railroad. Yep, take a good look at the Bethesda freight house and try to figure out why it was designed the way it was. No tracks lined up to it for trans-loading. It has a nice broad raised platform for vehicles to unload/load on, but no railroad connection. An oddity, for sure. What proceeded the brick depot is a mystery to me. Any info would be most welcome. Enjoy the following photos, courtesy B&ORRHS.

June 17, 1941. B&O RR Bethesda, MD – Freight House under construction. Maloney Concrete is providing the concrete mix today, as the floor and the loading dock is poured by hand. Workers above work on framing the roof. Photo by the B&O RR, courtesy B&O RR Historical Society.
July 9, 1941. B&O RR Bethesda, MD – Freight House, front side. The structure is now complete and cleaned up for its photo op. Here is the front side. Note the custom roll-up doors with two rows of windows. Photo by the B&O RR, courtesy B&O RR Historical Society.

July 9, 1941. B&O RR Bethesda, MD – Freight House, rear side. Note the large side window. The room at this end of the building was an office, sectioned off from the rest of the freight house by an inner wall. Included a chimney and no doubt had a wood-burning stove. The large window opened up with a view of the freight yard, which was behind the photographer. Photo by the B&O RR, courtesy B&O RR Historical Society.

As a sidebar, some of the blueprints I used to make my own model and drawings were also from the B&ORRHS and I shared them here:
https://www.flickr.com/photos/cpl_clegg/albums/72157687317143670 These include blueprints for the railings, iron work, roll up doors, windows and concrete flooring/footings.

Talbot Ave Bridge Girder Concept Art

Some will recall that the Purple Line folks intended to preserve and display the old girder(s) from the Talbot Ave bridge. They have just posted an artists rendering of what the old girders will look like at the Lyttonsville Station. Pretty neat. I’m just glad they were preserved!

Public artwork will enhance the #PurpleLineMD’s high-quality stations, aesthetic treatments and landscape designOne of…

Posted by Maryland Purple Line on Thursday, May 14, 2020


Layout Update: May 4, 2020 – Demolition and Planning

I have spent a good amount of time over the last week working on some new and some old projects. I made another revision to the Rock Creek Trestle plans after discovering a new photo showing how the top of the bents appeared. I adjusted one of the beams and shortened the ties, as I realized I used the wrong length in my plans. That is all corrected. I also stained all of the new wood I received a few days ago and have that drying.

Stained with a mix of about 85% Tie Brown and 15% Driftwood.

The biggest change to the layout is the removal of the temporary bridge across Rock Creek in preparation for scenery construction as I begin building the trestle. I also installed two plywood panels below what will be T.W. Perry (on the left) and some scenery support on the right.

Even them Duke boys couldn’t make this jump. Removed the temporary bridge in preparation for scenery and the trestle itself.

Installation of the trestle has been a real conundrum for me. If it was a frame structure, or made of iron, it would be a lot easier. I could build the scenery, carve away some plaster, install some “concrete” bases for the bents of the trestle and let it sit in place. Adjusting the height of the footers would be pretty straightforward. But this is a pile trestle, meaning that the round piles were driven into the ground. There is no “base.” The base is dirt. How do I install the trestle into the ground with the hope that some day I could remove it from the layout and preserve it? I have settled on building “steps” made of high density expanded foam board cut to specific thicknesses for the trestle bents to rest on. This will all be glued together and will be about as wide as the trestle and will span the gap of the layout. Once I build this base, I can carefully build up the scenery around it. I will use Howard Zane’s method of rosin paper and white glue with cardboard strip supports and then Sculptamold and plaster on top. If I need to remove the trestle, I can trim the hard shell and extract it. I experimented with foam for the base, but decided against it as I don’t have a good way to cut it and maintain a strict landscape profile that I want.

Remember those MRServo units I mentioned in the last update? Well I kinda went down the rabbit hole on those, too. I purchased eight of the now-discontinued MRServo-1 units. I believe they started using the board from the MR-Servo-2 and -3 units for the -1 toward the end, because that’s what I have. In reading documentation for these units, I learned that all they are missing are a couple of relays and terminals to convert them to MRServo-3 units. So after quite a bit of hunting and comparing specs and photos, I dug up the correct relays and terminals and ordered a handful from eBay. Will attempt to convert them later this Spring when the parts come in. The conversion will add power routing for turnouts and power routing for accessories.

I spent some time talking to Greg C. about structures in Bethesda. I want to model a few key structures and Greg is an expert in structure building. He has been helping me push through the mind block that is planning what to model and how to do it. Right now, I am studying photos and mocking things up to start to get proportions and ideas.

Maloney Concrete on the left, Frito-Lay in the middle.

These are meant to be super rough ideas. I just cut apart some mat board scraps I had laying around and taped them up. It’s to get the brain going on where I will eventually place things. Also gives me an idea for any drawings I can start working on for structure walls. Some of them will likely be custom jobs. That’s all for now!