This neat video showing various railfan excursions from the 1950s to 1970s in the DC area shows a wide variety of subjects, including a brief, rare color film shot of the trolley approaching its crossing of the B&O’s Georgetown Branch, which crossed the trolley tracks on a deck girder bridge. The trolley last ran to Glen Echo on Jan 3, 1960 and the area beneath the bridge would be filled in later that year. (I walked the line back in 1991 and witnessed this deck girder bridge sitting only a few feet off the ground. It was a strange sight.)
Video begins at the 5:54 mark and is only a few seconds long, but it’s neat to see. In the background you can see the GB bridge crossing over the tracks. There was a second deck girder bridge to the left which extended the crossing.
Merry Christmas! Some more great progress has been made. I know it doesn’t look like much but I am making great headway considering the fits and spurts of attention the layout gets. All of the trackage at Chevy Chase is done and wired up. (Minus the turnout frogs, switch machines and the coal trestle at T.W. Perry.) the trains can now run all the way to just before Bethesda. Track is half way through the curve at the end of the room. Feels good to make such progress.
My goal is to get the upper deck done by the end of the year and I’m very close. I have already cut and prepped all of the track in Bethesda but had to rip it up so I could wire frogs and holes for switch machines. I also spent a day working with my friend Matt who helped me add some more prototypical curvature at the east end and rework my sidings. These changes are already in place, I just need to get the track in. One more week? Can he do it? Stay tuned.
Made some great progress this past week. The area around Chevy Chase is taking shape. I laid track halfway through the area and finished fitting the rest of the main and passing siding. I ran out of time to complete laying it. Still need to solder the drops to the rail bottoms and spike into place. After that I will install the team track which will go on the curvy bit of roadbed I installed.
I also installed a new-to-me Digitrax system that was graciously given to me. It’s an Empire Builder 2, about 15 years old but nearly new. Unfortunately the DT300 throttle suffers from the capacitor plague and I will have to have it repaired by Digitrax. Since they were badly hit by hurricane Michael it will not be for a few months. No worries for now, I have an old UT1 to play with. 🙂
Did some cleaning up and consolidating of scenery materials and storage in the layout room and a few other layout tasks. It’s been a productive week! More soon.
Another relic from the Georgetown Branch surfaces as a siding in Bethesda at River Road emerges from the brush.
Eagle-eyed viewer, contributor and friend Rich Pearlman went exploring the area around the crossing at River Rd. and came across the tracks on the South side of the intersection. I had a sneaking suspicion there were tracks there as I had previously seen and photographed rails buried in the dirt but I hadn’t seen them listed/shown on the maps I have, nor do I have period photos of them.
Well, Rich did the heavy lifting, digging through the B&O Railroad Yahoo! Group site to uncover a comment from Christopher Parker outlining a brief history of that siding. Here is what he wrote:
The siding, which was quite long (more than 10 cars), once served Metropolitan Fuel Company, across the tracks. By 1980 it was grown over and disconnected from the main, but the pipes and connections for
unloading tank cars were all still present. Metropolitan Fuel Company was purchased by Stuart Petroleum along with next-door Washington Fuel
sometime in the early eighties.
A red wooden caboose sat on this siding all through the seventies. When I first got a look at it in the late seventies, it was quite abandoned and didn’t have a road name on it. Around 1982, give or take a few
years, it was damaged by fire.
In 1981 or 1982, this siding was re-connected and the first 100′ was used by Jack’s Roofing Co to unload Cedar Shingles. They’d get a box car about every two weeks, sometimes less. UP, BN, BCOL, SP. Jack’s
Roofing also used piggyback service (unloaded elsewhere) to get a truckload of shingles every day. Jack’s Roofing company was located a bit behind Roy Rogers, a few buildings away from the tracks. I recall
them using a two axle flatbed truck and forklift.
So there you have it – the siding had multiple purposes and served a few industries over the years. It’s a neat story and a neat relic! I should really get down there and see it myself, because the fact that someone cleared the brush and put up those small red survey markers leads me to believe it won’t be around for long. 🙁