Monthly Archives: May 2023

Layout Progress Update: May 2023

A quick update to share a few snapshots of some progress and talk about what has been going on since the Winter. Well, first up, between December and January I took on a massive project; replacing the transmission in my 2006 Honda Odyssey. The task was no small feat and I did nearly all of the work myself. As a result, I have a functioning car again, and have likely permanently damaged an already questionable right shoulder. (A recent MRI revealed the reality that surgery is likely in my future.)

Out with the old, in with the old. I purchased a replacement JDM (Japanese Domestic Market) transmission on eBay from a local vendor. The job took me a couple weeks of evenings/weekends to complete and was an absolute bear.

But I digress. I showed you the Rock Creek trestle mocked up in place. Now let’s take a look at how I got there. I made the decision that building the trestle would be my priority. First up was to start mocking up the terrain to be sure it would work with the existing design. So I used some masking tape to outline the land forms.

Red highlights indicate where the benchwork interferes with gentle slope on each side of the approaches to the trestle.

What became apparent was that the angle required for the long fill the trestle approaches sat on would not work with the existing benchwork. I also had the idea that it would be nice to be able to remove the trestle should I want to transport/save it from the layout room in the future. This required completely rebuilding this section of the layout, by essentially widening this dropdown area.

After removing some benchwork on the right and left side, widening the gap for the new dropdown section. Thankfully there was enough slack in the wiring to simply slide the new pieces in.

I then needed to install the trestle and shim it to sit flush and level with the track, so I could measure the height of each riser.

Bridge is in the new, wider dropdown benchwork and shimmed to be flush up against the level which is gently clamped to the railhead.

I measured the height from the base to the lowest pile in each bent. I subtracted about 1/16″ and fashioned risers from 1×4’s and other boards.

Risers, laid out in order.

I installed the risers so the bent sits just on the edge. I will shim up to the height of each pile, since they are uneven. Risers were glued in place with wood glue.

Risers installed, bridge in place. Need to shim up to each piling.
The risers all installed. Note the new, wider dropdown for the bridge. This allows for the approaches to be nicely contoured similar to the prototype.

Now that the risers are in place, I can begin building the landforms, including the creek itself. I’ve still got a bit of work to be done on the bridge; namely the stringers on the top deck and some other details, but otherwise I’m nearly done. The same day I worked on the new benchwork, Kelly came over and helped me figure out and install the new benchwork as well as some foam at Chevy Chase and at Georgetown Jct. Progress!

Making sure the edge is flush. This is Chevy Chase. That area will have the golf course, part of the swimming pool and some other terrain.

A few other command system and lighting improvements: I deaccessioned myself from the old Digitrax Empire Builder II system and picked up a new TCS CS-105 unit.

After a weekend of setup, it is functioning beautifully.

With the addition of my trusty RasPi/JMRI, the ProtoThrottle is working well, too.

I also installed LED strip lights beneath the upper deck on half of the layout.

This is very much a work in progress as I attempt to best engineer how to get the most out of them, but I am really pleased with the initial setup. More to come on this later.

This is with the room lights off.

I’ve also been giving some thought to completing my model of the Bethesda Freight House. If you recall, a few years back I designed and laser-cut parts for my model of the station, but hadn’t assembled it. I spoke with Greg C. who is a master at building structures, about how to proceed and he gave me some great tips. I need to figure out the inserts for some of the moulding around various windows and engineer how I will install the garage doors, and get building.

Well, that’s all for now. Life is quite busy at the moment; my kids are wrapping up the school year, lots of sports activities, road trips, and other commitments. I’m taking a week off to host my cousin and we are planning on hitting several regional railfan spots, hobby shops and working on my layout. Hopefully more progress reports soon!

Scale Wheel Stops Video Short

Recently friend of the blog, Greg Cassidy, did a YouTube Short on Kelly’s magnificent 3D printed HO scale wheel stops based on the prototype. Have a watch:

https://youtube.com/shorts/hurWsa3R4_Y?feature=share

A few years ago I was lamenting to Kelly how there were no good HO scale wheel stops on the market. Nearly all of them look chunky and oversized. (because they are.) We visited a stretch of abandoned Georgetown Branch right of way in Bethesda where a siding still exists that includes original wheel stops. Kelly was inspired to draw up a model in Fusion360 and printed a few test items before developing a final design. Here are a couple in place on his layout:

They are simply the finest wheel stops on the market, full stop. (pun intended.) They are 3D printed in resin, are quite durable, easy to install and if they break, you can simply glue another one on. Kelly sells them over on his site, FineScale360. Get a few for your own layout!

1959 B&O Crossing the Cabin John Trolley Line

I found this print on eBay recently and am quite pleased to add it to the Georgetown Branch collection. The caption on the back of the 8×10 print reads: “1/59 Washington, DC – Line #20 – B&O RR trestle – crossing over Cabin John line.” The photo was taken from the west side of the trestle, facing to the east.

Jan 1959 – B&O trestle crossing Cabin John trolley line. Photographer unknown. Personal collection.
Approximate location of the photographer, facing East. Historic Aerials.

At the time, the Dalecarlia Reservoir was undergoing a massive expansion project. Aerial photos from 1949 and 1957 show the scale of the expansion.

1949. Historic Aerials.
1957. Historic Aerials.

The last trolley on the Cabin John Line was on Jan 3, 1960, and the entire system was fully closed in 1962. Congress revoked its charter in 1956, so likely seeing the writing on the wall, the Dalecarlia reservoir began expansion in the mid 1950s. The right of way was repurposed and is where some major buildings and two of the settling ponds exist today.

The old Cabin John trolley line is outlined in light green on this map. You can see how much has been built on the old right of way.

A link to my Georgetown Branch Google Map

Hope you enjoy this brief view of the bridges over the trolley line. If only there was a train passing by! 🙂