All posts by bsullivan

Georgetown Work Train, ca 1910, aka the “white whale” breaches once more

B&O #25 in Georgetown, ca 1910Once in a while a real gem appears. That “white whale” breaches the surface, giving me a glimpse that the never ending hope of finding that piece of a puzzle that completes the picture is still out there, somewhere, yet to be unturned. The joy that one small sliver of history wasn’t burned, thrown away or otherwise destroyed and has managed to be preserved for future generations. All my life I have been driven by the joy and nostalgia that I find while searching out old railroads and what the men who came before me did to create such massive wonders. Since the late 1990s the Georgetown Branch of the B&O RR has (obviously) been my primary interest. Thanks to a  magnificent group of folks at the B&ORRHS and other places my research and excitement has been fed like a trail of breadcrumbs for an  excited dog. But occasionally I find not a breadcrumb, but rather a meaty, marrow-filled bone. Today is one of those days.

This photo, which comes from the wonderful Old Time DC Facebook page is one of those such bones. Shared by user Bill Ulle, he writes: “My great, great uncle, Louis Samuel Crown, left, around 1900, along Georgetown waterfront. Near present day Key Bridge.” Not only are photos of this area rare in this time frame, but seeing a steam loco up close is the “white whale” I spoke of earlier. Let’s break this down. The photo was probably some time closer to 1908-1910 when the line was being built into Georgetown. The B&O had to enlarge the Northernmost arch of the Aqueduct Bridge to allow passage of freight traffic to pass beneath it and on into Georgetown. The OP says he has another photo showing his relative working on that. (Can’t wait to see it!!)   Looking into W. Edson’s book Steam Locomotives of the Baltimore and Ohio (B & O): An All-Time Roster, we see that #25 is a class D-2 0-6-0, built Pittsburgh, 1887 (17″ x 24″ cylinders, 50” drivers, 79,700 pounds weight, 130 pounds) By 1915 it was off the roster. That means that it’s likely this photo was prior to 1915. Also note, the ties and trackwork look immaculate, as if it had very recently been laid.

I would wager, that this photo captures the very earliest stage of the construction of the line into Georgetown. If you were able to go back in time and walk through the viewfinder, you’d look right and see a brand new track extending along a newly filled and formed waterfront area with boathouses appearing next to old mills and foundries along the riverside. If you looked out across the river, you’d see the bustling industry of Rosslyn, VA. To the left, you would walk under the arch under construction and on into Georgetown, where a myriad of ancient buildings, tall timber trestles with tall piles of coal surrounding their pilings, delivered from far away up the C&O Canal and being transloaded onto boats lining the docks. The waterfront was busy at this time, excited to have the railroad finally arrive. Another insult to the C&O canal its long history battling the B&O since day one (literally).

Building the Metropolitan Southern Through Dalecarlia Reservoir

Whilst digging around for information on the Girls Reform School that was located at the current site of Sibley Hospital (more on this later) I stumbled on some background to the construction of the Metropolitan Southern, one of the three predecessor line to the Georgetown Branch, through the Dalecarlia Reservoir. The article first describes the Dalecarlia area but then goes on to outline the agreement between the US and the B&O as they laid their line through the reservoir. Most of it seems occupied with the concern that the US had to keep the water in the reservoir clean and separate from the intrusion of the rail line. Interesting stuff!

The survey of the boundary lines of the aqueduct lands both in the District of Columbia and in Maryland which was commenced in the fiscal year 1890 91 was continued but not much was done during the year Boundary stones suitably marked were planted at all the angles except two that were not already marked from the Dalecarlia receiving reservoir to above Cabin John Bridge By an act of Congress approved by the President on the 11th of July 1892 the Attorney General the Secretary of War and engineer commissioner of the District of Columbia were empowered to select from the lands in the District of Columbia belonging to the United States a site for a girls reform school Under the decision of the commission a tract containing 19.39 acres and comprising nearly the whole of the reservoir land lying between the Conduit road and the Little Falls road was surveyed and existed from the reservoir lands for this purpose.

Interestingly, the article goes on to describe the genesis of the Georgetown Branch:

THE EXECUTIVE DOCUMENTS OF THE HOUSE OF REPRESENTATIVES
FOR THE SECOND SESSION OF THE FIFTY THIRD CONGRESS 1893-94
IN THIRTY ONE VOLUMES
WASHINGTON GOVERNMENT PRINTING OFFICE
1895

Appendix BBB – Washington Aqueduct pg 4287

During the year the Metropolitan Southern selected and surveyed its route through the lands of receiving reservoir as authorized in the following approved by the President on the 3d of March 1891:

Be it enacted by the Senate and House of Representatives of the United States of America Congress assembled That the Metropolitan Southern Railroad Company is hereby authorized to construct its road across the grounds of the United States forming a part of the grounds of the receiving reservoir in Montgomery County in the State Maryland north of the northeast boundary line of tne District of Columbia and for that purpose said company is hereby granted a width of sixty feet at grade and such additional width as it may require for slopes of cuttings and embankments across said grounds for its right of way through the grounds aforesaid: Provided, That the location and plans of said road through said grounds shall be approved by the Secretary of War before the commencement of any work on said grounds and the work of construction and the operating of said road shall be subject to such regulations as he may prescribe and the damages for the use and occupation of the right of way herein granted shall be fixed by a board of three Army officers appointed by the Secretary of War and the payment of said damages so fixed shall be a condition precedent to the exercise of the rights by this act granted which are to terminate at the pleasure of the Secretary of War in case of persistent neglect by said company or by its successors to comply with the regulations aforesaid.

pp 4288 REPORT OF THE CHIEF OF THE ENGINEERS, U. S. ARMY.

The location and plans of the road were submitted by the company and approved by the Secretary of War on the 25th of January 1893 and the regulations concerning the work of construction and the operating of the road were prescribed by him on the same date These regulations which had previously December C 1892 been accepted by the company are as follows:

. Regulations respecting the construction and the operating of the Metropolitan Southern Railroad through the lands of the United States, in Montgomery County, Maryland pertaining to the receiving reservoir, by virtue of an act of Congress approved by the President of the United States on the 3rd of March 1891

1.     In that part of its route where the Metropolitan Southern Railroad shown in the plan of Parcel No 1 of the plans of tho railroad and between said parcel and the railway tunnel is not in cutting substantial retaining walls shall be constructed by the railroad company between the reservoir and the railroad to such height, not less than the height of the roadbed, as will, with paved gutters behind them, be sufficient to catch and lead alongside the railroad and away from the reservoir, all the drainage from the roadbed, the land pertaining thereto, and the land behind it, either southward through the railroad tunnel or northward to the small stream that is to be crossed by the railroad near station No. 317 of the plans of the railroad. The retaining walls shall be kept in good order by said railroad company and its successors

2.     Paved drainage gutters shall be constructed by said railroad company behind the above-mentioned walls and across the railroad bridge and through the tunnel and cuttings, of ample size for the above purpose, and they shall always be kept by said railroad company and its successors in good order and free from obstructions. No drainage water shall ever be permitted by said railroad company or its successors to flow from or across the roadbed or the lands pertaining thereto, or the land behind it, into the reservoir.

3.     The crossing of the conduit between Parcels Nos. 1 and 2 shall be made by a substantial iron or steel bridge of not less than fifty (50) feet span, the abutments of which shall not be less than twenty-five (25) feet from the middle line of the conduit measured on the middle line of the railroad, and the said railroad company shall have the right, subject to the act of March 3, 1891, to maintain said bridge over said conduit. No part of said bridge between the abutments shall be lass than nine (9) feet above the surface of the ground as it lies over the conduit and no deposit of any material shall be made by said railroad company or its successors between the abutments.

4     No dumping or deposit of any material shall be made by said railroad company on the land of the United States outside the boundaries of the land ceded to said company. If any other deposits of material shall interfere with access by wagons and carts to the “north connection” of the reservoir, a convenient wagon road thereto shall be graded by said railroad company to the satisfaction of the engineer officer in charge of the Washington aqueduct. Efficient means shall be provided by said railroad company for preventing any leakage through the bridge, and all drainage and washing of earth upon the space between the abutments of the bridge and upon the laud of the United States near the north connection not ceded by the United States to said company.

5.     A substantial fence (10) feet high shall be constructed by said railroad company between the railroad and the reservoir from the Government line near station No 317 to the Government line near the mouth of the tunnel. The design, the location, and the construction of the fence shall be subject to tho approval of the engineer officer in charge of the Washington aqueduct, and it shall be painted and kept in good order and repair by said railroad company and its successors, The employes and servants of said railroad company and its successors shall not be allowed access to or to cross the United States lands around the reservoir.

6.     In all blasting in the construction of the railroad, and especially in the railroad tunnel under Dalecarlia hill, great care shall be used by said railroad company and its agents not to injure the tunnels 4 and 5 of the Washington aqueduct, and for all damage done to these tunnels by such blasting, said railroad company and its successors shall be responsible, and said railroad company and its successors shall make good all damages to the conduit, tunnels, and other property of the United States by said company and its successors, and by its and their agents.

7.     All of the slopes of railroad cuttings and embankments within view from the reservoir shall be sodded and kept in good order and repair by said railroad company and its successors.

8.     No claim shall ever be made by said railroad company or its successors for any damage done to tho railroad and its appurtenances either in the vicinity of or below the receiving reservoir by the water from the reservoir or the Washington aqueduct, or the water of Little Falls Branch in time of freshets at any time or under any circumstances.

9.     Stone monuments properly marked and of a design to be approved by the engineer officer in charge of the Washington aqueduct shall be planted by said railroad company at all the angles of the land conveyed by the United States to said company before commencing work on said land, and the said monuments are to be maintained in place and in good order by said company and its successors.

10.     The railroad bridges crossing the streams on the land ceded by the United States to said railroad company and the bridge near station No. 317 of the plans of the railroad shall be strong and substantial, and shall be maintained in good order by said company and its successors. The waterways under the bridges shall be of ample size to carry the water of these streams under all circumstances, and said railroad company and its successors shall keep said waterways free and unobstructed.

11.     The said railroad company shall provide convenient bridges or paved crossings for wagons over the railroad whenever and wherever they may be deemed necessary by the engineer officer in charge of the Washington aqueduct, and it and its successors shall maintain the same in good order.

12.     The said railroad company shall suitably pave and keep in repair the floor of the culvert near station No. 317 of the plans of said railroad, and shall construct and keep in repair a paved gutter through this culvert of ample size to carry the water of the stream that is to flow through the culvert. Both the floor of the culvert and the gutter are to be kept free of obstruction by said railroad company and its successors.

13.     The said railroad company shall construct, and it and its successors shall maintain at its and their own expense, a substantial post and rail fence on the boundary lines of the property ceded by the United Stales, but this requirement shall only apply to the boundaries between the lands ceded and the lands that remain the property of the United States.

14.     Before commencing work on the lands ceded by the United States the Metropolitan Southern Railroad Company shall deposit with the Treasurer of the United States, to the credit of the Washington aqueduct, the sum of one thousand five hundred (1,500) dollars, for the purpose of making good to the United States the cost of such inspection of the operations of said company as the Secretary of War may consider necessary for the protection of the Washington aqueduct and its appurtenances, and the said company shall deposit as aforesaid such further sums as the said Secretary may require. The said moneys shall be disbursed like other moneys appropriated for the Washington aqueduct, and whatever may remain of said deposits after the completion of said railroad through said lands, shall be returned to the said company with an account of their disbursement in detail.

15.     If the United States shall at time desire to construct additional waste any weir from the Washington aqueduct, and a channel for the discharge from said waste weir through that parcel of United States land which is southwest of Dalecarlia Hill and projects from the aqueduct lands between boundary stones W.A.19-B and W.A.22-B, then the said Metropolitan Southern Railroad Company or its successors shall, on the demand of the Secretary of War, construct and maintain at its or their own expense, a suitable and substantial iron or masonry railway bridge over said channel on such plans as may be approved by the said Secretary.

16.     The Secretary of War may make such changes in these regulations and such additional regulations as he from time to time may consider necessary.

ENG 93 269

Metropolitan Southern Extension on an 1893 Map

1893 Dalecarlia map
1893 map showing planned Met. Southern extension across Potomac

Well, look what I found on eBay! This map, dated 1893 is titled “Receiving [Dalecarlia] Reservoir], Plan of the Improvements proposed for cutting off from the reservoir the polluted water of its watershed. As many faithful Georgetown Branch fans will tell you, the Georgetown Branch originated as three separate entities:

“The Metropolitan Southern Railroad would develop the line from the Metropolitan Branch (the B&O main line at Silver Spring) to the Potomac Palisades. The Metropolitan Western would build the Virginia section of the line from the Potomac River to Quantico. Finally, the Washington & Western Maryland would complete the spur line from Potomac Palisades to Georgetown.”  (From http://www.cctrail.org/CCT_history.htm)
Chevy Chase Lake, ca 1890
Chevy Chase Lake, ca 1895

This map covers the area around Dalecarlia Reservoir. At the time the map was made, the Georgetown Branch (or Metropolitan Southern) was still in its early planning stages, having only been completed to the area around Connecticut Ave. in Chevy Chase. (see photo) If you will notice, the line doesn’t even extend toward Georgetown! There is a line crossing the Potomac River and another branch heading North into the reservoir, surely to provide building materials and other freight to the plant. It’s unknown where the line would have led.

In all of my memory, I do not recall an map depicting this crossing actually existing. One might surmise from the map that it did at one point, which of course it did not. It does reinforce, however, that there were plans circulating from the railroad at the time that do portray their goal of having a line that connected the B&O to the South. Of course due to many factors, it never happened and it became a small footnote of grand ideas in the long history of the branch and the B&O railroad, for that matter. I am excited to have a picture into this past.

Drawing the C&O Canal Bridges

CO Canal Bridge 3
Drawing of Bridge 3

One of the signature items I have planned for my Georgetown Branch layout are the three bridges spanning the C&O Canal & Canal Rd. These bridges were cobbled together from other parts of the B&O system when the line was laid down in 1908-10. I have thought about options for modeling these bridges and I am leaning toward a mixture of brass, styrene and museum board (or mat board) that is laser cut. I obtained a copy of the blueprints of the bridges but they are many generations of photocopies old and need lots of cleaning up. I figured redrawing them in Illustrator is a good starting point so I had some fun with the first (easiest) bridge of the three, a simple 30′ deck girder span.

The biggest challenge is alignment of the drawing with the precise nature of the software. I know I’m not going to get this exact, and that’s OK. What I’m aiming for is something scale and relatively accurate that I can work with once I finally do start to build the model itself. Getting started is sometimes the hardest part and I’m hoping this will be the motivation I need to get things rolling.

This is a “sneak peak.” I still have the top view to do and a few details. Also, the rivets are approximated using photos; today I counted myself among the rivet counters of the world for the first time. 🙂  I hope you enjoy the preview and I hope I can keep up the momentum to produce more illustrations as time permits.

Kelly’s Georgetown Branch layout updates

Dale_Tunnel5My friend Kelly is moving along on his Georgetown Branch layout, making great strides and some impressive progress! My model RR club, RMRRS, visited his layout a couple months ago and were really impressed. He has since completed the “paving” in Georgetown and reworked and scenicked the Georgetown Jct. area. Very cool!

http://cs.trains.com/mrr/f/11/t/212970.aspx

I have some more photos in my gallery: http://gallery.sluggyjunx.com/railroad_and_industrial/2013_rr/Kelly-s-Georgetown-Branch-layout

UPDATE: Unfortunately a couple years ago the layout was dismantled. Kelly is considering a new GB representation in a smaller size.

Article about the Hopfenmaier Rendering Plant

Rendering Plant
Hopfenmaier Rendering plant

A really neat article from a few years ago that begins with a search for a long-lost sign and ends with a shoebox history of the struggle between one smelly industry and residents (and everyone else) in Georgetown.  The Hopfenmaier rendering plant existed at 3300 K St., NW on the waterfront for nearly 100 years, until finally being ousted by fed-up residents and politicians. The rendering process takes leftover animal parts and oils used in food prep and renders them into lubricants, fuels and other uses. It’s an aged process (still in use today) but one that results in a massively horrible odor and residue. I have been told by first-hand accounts that the Whitehurst Fwy. (erected in 1948) had a coating of sooty grease and an odor that on a hot day, many years after the plant had shut down, would be unbearable. I can only imagine. Enjoy!

http://www.washingtonpost.com/local/searching-for-that-old-washington-flour-sign-about-objectionable-odors-along-the-whitehurst-freeway/2011/05/24/AGbNl2IH_story.html

Layout Construction update

Upper helix lead
The upper deck helix lead.

It has been a very, very long time since I posted an update here on the blog about my model RR progress. Let me get things up to speed. The benchwork for the layout is about 95% complete. I have a few odds and ends to do but that hurdle has been crossed. Now I am working on adding the subroadbed, roadbed and connecting bridges and track. I completed construction on the helix and recently constructed the upper bracket and transition to allow the track to transition off the helix and enter the layout room. Remember, my helix is mobile and must be able to detach and roll away from the wall whenever the HVAC is serviced (like today!)

The staging yard was completed and track laid. I also built and installed a hinged swing-up bridge (with neodymium magnets to hold it in the up position) that connects the staging yard and the staging lead going into the layout room.  With some assistance from my train club several areas were completed, including the base for Rock Creek, and the lower helix lead entry point through the wall. One member, Tom, came over and helped me figure out how to do the entire Georgetown Jct. area, including the subroadbed and track arrangement. I realized I needed to put in the upper helix lead first, so that is what I am working on currently.

All in all, I have not been terribly busy with the layout. There are many distractions and I have many hobbies so I come back to it when I can. Also, I have spent a good bit of time researching the GB and have many, many materials to go through and add to the catalogs and notes and that takes time, too. I’m having a heck of a lot of fun with it.

As always, I try to keep my Gallery up-to-date where you can see snapshots of my progress. Enjoy! http://gallery.sluggyjunx.com/railroad_and_industrial/georgetownbranch/modelrailroad/2010-11_model_rr

Bethesda Frito-Lay Plant history

I found a brief mention of the Frito-Lay plant in Bethesda today while searching for some info on lineside industries. This was featured in a Q&A section on Bethesda Magazine’s website:

A neighbor who grew up here told me there was a Frito plant on Elm Street and Arlington Road in the 1940s. What was its exact location?

—Susan Rubel, Bethesda

The Frito Capital Company was at 4860 Bethesda Ave.—the current location of the Apple Store—according to a 1949 telephone directory in the Montgomery County Historical Society library.

Frito-Lay spokeswoman Aurora Gonzalez says the plant was purchased by H.W. Lay & Company in the 1950s, and that it made Fritos corn chips until a new plant in Brentwood, Md., replaced it in about 1963.

William M. Offutt, author of Bethesda: A Social History (1995), recalls the plant being served by the Baltimore & Ohio Railroad. He says the scent of Fritos chips baking “added a very distinct smell to the neighborhood.”

View of Georgetown, including a steam switcher!

between 1909 and 1920
between 1909 and 1920

An alert fan of the website alerted me to an image on the LoC.gov website showing the steam switcher in action! These photos are so rare I just had to see. Wow! The photo is far away, shot from Rosslyn, looking toward Georgetown, but there it is. It’s making quite a good bit of smoke and appears to be idling or moving slowly. Can anyone identify the class of loco?

Here is a link to the site:

http://www.loc.gov/pictures/collection/npco/item/npc2008000741/

By the way, there are many, MANY fantastic images in and around this area to be found on the LoC site. Happy hunting!